Anyone watching a glued wall grow mainly sees blocks and elements. But the most important course is the bottom one: the kim course.
The first course sets everything
A concrete floor is never completely flat. The kim course absorbs those irregularities. The kim blocks are set in a bed of mortar, exactly level and at the right height. Everything that follows is glued with a thin glue joint and so follows the kim course.
What if the kim course is wrong?
With a glue joint of two millimetres there is little to correct. A deviation in the kim course carries on to the top of the wall: courses run crooked, the top does not reach the right height and openings are not where they belong.
Setting a kim course is skilled work
That is why relatively a lot of time goes into the kim course. Once the kim course is set and has hardened, gluing the elements or glue blocks goes fast.