Gluing crew for contractors and builders.
Looking for a crew to take on the wall gluing of your project as a subcontractor? We glue calcium silicate walls to your drawings and schedule.
Gluing work as subcontracting
As a subcontractor we take on the gluing work of the shell (structural work): inner leaves of cavity walls, load-bearing interior walls and party walls. We work from the element drawings or the construction drawings and agree the sequence with your site manager.
What we need
To price a project properly we would like the drawings, the specification or technical description, the schedule and the agreements on material, crane and storage on the building site. The more complete the documents, the sharper the quote.
Coordination on site
Gluing work is at the start of the shell: once the walls stand, the floor can go on and the next crews can continue. That is why we agree the start date, the delivery of the elements and the sequence per block beforehand.
Which projects?
Housing, apartments and smaller projects such as a detached house or an extension. See working with glue blocks for how we work, or request a quote straight away.
Frequently asked questions
Do you work with your own block-laying crane?
We agree that per project. The quote states who supplies the block-laying crane and the other equipment.
Can you also set the kim course?
The kim course sets the dimensions of the whole wall. Whether we include it, we agree with you beforehand and it is stated in the quote.
What we glue.
Calcium silicate gluing
Load-bearing and non-load-bearing calcium silicate walls, glued neatly and true to size.
02Laying glue blocks
Hand-laid gluing work with glue blocks. Ideal for houses, extensions and smaller jobs.
03Aerated concrete gluing
Light aerated concrete blocks (such as Ytong) for interior walls and renovation.